Defects in plaster work-how to repair.

Plaster work have these main defects,
1-.Cracks
2-Pitting and Blowing
3-Falling out of plaster

Reason on Behind it--

Cracks--
  1. Structural Defects in building.
  2. Uneven of surface
  3. Discontinuity of Surface
  4. Plastering on too wet surface.
  5. Over rapid drying of plaster 
  6. Excessive shrinkage
  7. Thick coats of Plaster
Pitting and Blowing--
  1. Slacking 
  2. Hydration of Cement
  3. Not proper curing
Falling out of plaster--
  1. Not proper key to hold.
  2. More moisture in wall surface. 
  3. More thermal changes.
  4. Rapid drying
  5. Not have proper time gap between plaster coats.
Repairing of plaster ---
  • Hair cracks should be repaired from pop.
  • Others cracks can be repaired from the mix of Plaster of Paris : Cement : Sand.(1:2:7)

Before Wall Plaster Work-Its should be.

Plaster is protect your wall to defect but if you have a problem with your plaster work,so we should be ensure about its quality.

Before Wall Plastering-

  • Wall must be clean and free from all dust ,loose material ,grease ,oil etc.
  • Wall must be wet for a few hours before plastering work.
  •  Apply a net mesh on RCC and brick joints.
  • Plaster must be apply in three coats.
  • Every coats of plaster must have a gap of  3-5 day for proper set and shrinkage.
  • All Plaster shrinks on drying.
  • First coat should be strong.A strong coat should not be applied on weaker coat.
  • All electrical conduit pipe fitting must will be completed.
  • Plumbing work is also be completed in case of kitchen and Bathroom.
  • Its should be uniform.
  • Check proper on all edges on its first coat.
  • Ceiling plaster should be first and after start wall plaster.
  • Plaster mortar should not be too wet (watered).
  • Plastering Sand should not be too fine.
 If you have any query just mail me at  info@bhawan.nirman.com and if you want to construct your home from our company just call us on 9307211669.


How to check the strength of concrete from the machine.


Concrete is the mix of cement:aggregate:sand:water. Now days concrete is main part of building construction ,so this is most important thing we get desired strength of poured concrete.

Steps for check the strength of Concrete-

    • Fill with concrete in a 6"x 6" cube of 2 set of 3Cubes.(This is shown in pic with dated and grade of concrete.)
    • Next day open mold and pored it into water tank (Cube)  
    • Start the machine.
    • After 7 Days Put the cube in machine and check the reading.

    How to calculate the strength of concrete cube.


    What is Grade of concrete and its ratio?

    What is honeycombing and how its defect your structure.

    How i done my slab waterproofing?

    Which ratio I use for my footing,column,Beam and slab in my home.

How to start Your Plot Marking.

Survey of plot is most important and first part of building construction,it should be in Engineer's supervision or in talented mason.First you read and understand the plan drawing with the help of engineer/Architect.

Material Required.

  1. Plan drawing /Site Layout Drawing
  2. Plumb
  3. Thread
  4. Meter Tape
  5. Chalk Powder
  6. Steel Cut pieces
  7. Bricks 
  8. Sand 
  9. Cement
  10. Water
  11. Water Level pipe (If possible use auto level)
  12. Paint 
  13. Brush
  14. Labor
  15. Mason 
Before starting marking of plot/site ,you should be organised a small prey of God (Pooja) and invites friends and relative.

Steps- How to start-

  1. Pooja 
  2. Material Arrangement
  3. Check required plinth level and actual Level
  4. Now next work is done from Mason ,Labor and Engineer.
Be ensure about all layout and check dimension if you have not Engineer for Supervision.


Important point must know before constructing your dream house.

House construction is not a easy job for common man ,here we want share some important point which help you in constructing your dream house and save your money without any quality compromise.

  • When you start your dream house ,first manage the water from boring,supplying or any other way.Water is most important part of construction because water is used at every stage.
  • Make clear about plan drawing, elevation drawing, material estimate and cost estimate, Because if you have every details about drawing ,material then your mind have clean and clear concept.
  • Never start your construction in Rainy Season ,actually start after rainy reason or 3-4 months before rainy reason.
  • Take quotation of material from market after starting the excavation or footing work.Its will be very helpful to find material and its save your cost of construction.
  • Apply for electric connection ,Nagar Nigam registration and all other govt registration if any.
  • Never use less than 12mm steel/Reinforcement in column in main building structure. 
  • For Column,Beam and Slab use minimum ratio 1:2:4 in residential house.
  • Use branded items for electrification because local material is very risky and wants more maintenance.
  • Never make foundation on filled soil, first make foundation of building after start its soil filling work.
  •  On Ground floor , use 150 mm sand filling below flooring.Its gives more and very effective strength for flooring.
  • For wooden work,Search more and starting of home construction.
  • Use over burned bricks for foundation (brick ballast concrete).
  • Load bearing wall should be at least 9 inch.

I want a building contractor for my home in Lucknow.

We are a building contractor which works for your home.We are making homes on both basis labour rate /with material. If you interested in to make your home by a contractor you can take a quotation from us.

Only a model pics 
घर बनवाने के लिए सम्पर्क करें।
Why you Choose Us--
*Better quality of work.
*Well trained staff that gives satisfactory job to our client.
*We are giving good and fair deal.
*We are giving fast result /or as per client requirement.
*Being legally ,morally,ethically correct .
*We makes your home like i make our home.





We deals in many types of work,


  • Civil/Construction Work
  • Electrical fitting Work
  • Plumbing Work
  • Interior Decoration Work
  • Re-construction Work
  • Dis-mental Work
  • Pile Work
  • Painting Work
  • Flooring Work
  • Carpentry Work
  • Estimate Service
  • Property adviser Services
  • Survey Work
  • Any Contract Work